how much shuttering is required for 1 cum of concrete

Request a quotation

Simply complete the form below, click submit, you will get the price list and a GM representative will contact you within one business day. Please also feel free to contact us by email or phone. ( * Denotes a required field).

How to calculate the Shuttering area for …

This footing having 4 sides over which shuttering is going to use. As we know that the footing downside is attached with the earth or top side is open to the air so that footing these places are neglected for shuttering area calculation because there is no need of any type of the shuttering. One Side Area = L x T = 2.5 x 0.5 = 1.25 meter square.

Get Price

How much steel required for 1cum of concrete …

How much steel required for 1 square meter slab? Please specify the Gauge or thickness Asked in Engineering How much steel per cum of concrete? 120 kGS …

Get Price

For one meter cube of concrete how much kg …

For example, according to SP (Russian norms for Nonprestressed Concrete Structures) minimum reinforcement area should be determined Asmin = mus * b * h0, where Asmin - is the minimum area of reinforcing steel within the tensile zone, mus - is the minimum reinforcement ratio, for bending mus =0.001, for bending with axial force mus =0.0025, b - is the concrete cross-section width, h0 - is the ...

Get Price

IS 456 (2000): Plain and Reinforced Concrete - Code of ...

8.1 General 8.2 Requirements for Durability 9 CONCRETE MIX PROPORTIONING 9.1 Mix Proportion 9.2 Design MixConcrete 9.3 NominalMixConcrete 10 PRODUlllON OFCONCRETE 10.1 QualityAssuranceMeasures 10.2 Batching 10.3 Mixing 11 FORMWORK 1J.1 General 11.2 Cleaning andTreatment of Fonnwork 11.3 StrippingTime 12 ASSEMBLY OFREINFORCEMENT ·13 TRANSPORTING, PLACING, COMPACTION AND CURING J3.1 ...

Get Price

how much shuttering materials required in …

Lokesh Punj : Is it quantity of shuttering required not dependent on the Project Plan ... 1st one, then the material required will be x2 specially the shuttering formworks. More details » Get Price. how many average of shuttering in one cubic meter concrete. building so you can consider 5-6 Sqm / Cum of conc. but when you ... Cum, ultimatly there is no as such thumb rule but we can adopt a ...

Get Price

Types of Formwork (Shuttering) for Concrete …

Formwork (shuttering) in a concrete construction is used as a mould for a structure in which fresh concrete is poured only to harden subsequently. Types of formwork for concrete construction depends on formwork material and type of structural element.

Get Price

How much shuttering materials required in …

How much shuttering materials required in building thumb rule Products. As a leading global manufacturer of crushing, grinding and mining equipments, we offer advanced, reasonable solutions for any size-reduction requirements including, How much shuttering materials required in building thumb rule, quarry, aggregate, and different kinds of minerals.

Get Price

how much quantity a carpenter do shuttering …

Actually Shuttering output is depend upon type of structure,height of structure, slab to slab height,shape of structure, type of shuttering & most important availability of skilled labour.But for planning purpose 2.5 to 3.00 sqmt /per day ( 1Skilled Carpenter + 2 helper ) is reasonable value. Is This Answer Correct ? 72 Yes : 16 No : how much quantity a carpenter do shuttering per day.. Answer ...

Get Price

Design & Cost Analysis of Self-Compacting Concrete For ...

Design & Cost Analysis of Self-Compacting Concrete For Mivan Shuttering 1Syed Mehdi Abbas, 2Dada Patil ... M60 SCC 1 CUM Cement 72.58% Flyash 23.39% Micro Silica 4.03% C/Sand 51.99% C.A 1 48.01% A/C 2.72 W/C 0.28 Admixture 0.90% Table 4-Workability test results of trail 2. Time Actual Required 1 Flow table Test Initial 610mm Grea ter then 600mm 1 hour 540mm Greater then 600mm …

Get Price

Analysis & Rates, Analysis and rates for …

1) Laying reinforced concrete – 3 beldars, 3 mazdoors, 1½ Bhisti and ½ mason can do 2.83 cum (100cuft) per day. 2) Centering and shuttering for flat surfaces – 4 beldars and 4 carpenters (II class) can do 9.6sqm(96sqft) per day.

Get Price

Formwork (Shuttering) for Different Structural …

Concrete formworks (shuttering) are required for fresh concrete constructions such as slabs, beams, columns, footings etc. Formworks for these structural members are discussed.

Get Price

IS 4990 (2011): Plywood for concrete shuttering work ...

1.2 mm. 6.4 Plywood for concrete shuttering work shall be preservative treated and bonded with BWP adhesive. When required, concrete shuttering plywood may be supplied with or without any plastic coating or suitable overlay (see 6.7 and 10.1.4). 6.5 When boards of a size larger than the available press size are required, these may be made by scarf jointing the finished board, the scarf being ...

Get Price

How to calculate the Shuttering area for …

This footing having 4 sides over which shuttering is going to use. As we know that the footing downside is attached with the earth or top side is open to the air so that footing these places are neglected for shuttering area calculation because there is no need of any type of the shuttering. One Side Area = L x T = 2.5 x 0.5 = 1.25 meter square.

Get Price

Labor Requirement for Various Construction …

Labor Requirement for Various Construction Works. There are different types of labors that are required for the construction: Skilled labor; Semi-skilled labor; Unskilled labor; All these types of labors have different skills and different salaries. Their optimum use in every work in construction is essential to minimize the construction cost.

Get Price

How many cement bags required in 1cum …

How many cement bags required in 1cum reinforcement concrete M20 ? ... for M25,the total cement consumption will be around 400 kg.From that the number of cement bags will be 8 numbers for 1 cum ...

Get Price

Rough Calculation for manpower requirement …

I calculated manpower requirement as follows. Please suggest me if I wrong. Total Nos. of floors - 30 Nos. Completion time - 15 Months. Cycle time to complete one floor - 30/15 = 0.5 Months = 15 Days. Carpenter Required . Shuttering work quantum - 4000 x 1.5 = 6000 Sqm (Multiplied by 1.5 for shuttering for beams) Days to ready slab shuttering = Cycle time / 2 = 15/2 = 7 Days. Per day ...

Get Price

How to Calculate Quantities of Cement, Sand and …

In the step 3 of "How To Calculate Quantities Of Cement, Sand And Aggregate For Nominal Concrete Mix (1:2:4)" you have calculated that: 01 cum of concrete will require Cement required = 1/0.167 = 5.98 Bags ~ 6 Bags Sand required = 115/0.167 = 688 Kgs or 14.98 cft Aggregate required = 209/0.167 = 1251 kgs or 29.96 cft

Get Price

Calculators | Cement Australia

This series of concrete calculators has been developed to help you plan your project. You can calculate how much concrete, cement, sand, mortar or render you will need. For each calculation you will have to know the dimensions of your object. The calculator will perform the sums for you - where relevant it will add a small percentage for the wastage that inevitably happens when mixing & using ...

Get Price

How to calculate the Labor, equipment, …

1- material. 2- labour charge. material means :1- concrete price and that depend of wat element u want to cast it sub or super struc. and is it required green concrete or SRC or OPC approxmately it will be around AEd255 if its green concrete. oAed 215 if it SRC for mix 400 kg grade 40 n. also pump charge will be assume 50/m3

Get Price

How to Calculate the Quantity of shuttering for …

1. To calculate the quantity of Shuttering Plywood, Nails, Shuttering oil, clamps etc.? Given Data: Covered Area = 2,000 square foot. Shuttering type = Wooden The quantity of shuttering =? Solution: The quantity of the shuttering is to be done in numbers or in running foots. 1. Plywood: 12 mm thick (8′ x 4′) = Covered area x Thumb rule = 2000 sft x 0.02 = 40 No's Ans… 2. Wooden Battens ...

Get Price

How To Calculate Shuttering Quantity - Daily …

How To Calculate Shuttering Quantity: Shuttering is an essential temporary structure in which the fresh concrete is poured for casting different members of a structure. The shuttering is removed when concrete achieves its desired strength. There are different materials used in making shuttering such as plywood (as shuttering plate) Nails, wooden battens, beam bottom plates, wooden […]

Get Price

Important Thumb Rules for Estimation in Civil …

For example, if a volume of concrete 1 cum for a slab. Approx Steel requirement = 1 x 7850 x 1% = 78.5 Kg/Cum. Read: Bar bending Shape codes. Thumb rule for shuttering work. The shuttering work is called by another name "Form Work" because it gives a uniform shape and smoothness for the concrete. Generally, it takes 10% to 15% of the cost ...

Get Price